Skip to content
Leong Siew Weng Engineering (LSWE)
Leong Siew Weng Engineering (LSWE)Leong Siew Weng Engineering (LSWE)
  • Home
  • About
    • About LSWE
    • Mission / Vision / Values
  • Services
    • Civil & Offshore Construction
      • Civil & Structural
      • Offshore
    • Diving Systems
      • Saturation Diving Systems
        • Vessel Integrated Saturation Diving System
        • Portable Saturation Diving Systems
      • Air Diving Systems
      • Wet Bell Diving Systems
      • Hyperbaric Reception Facility
      • Life Support Package
      • Pressure Pot Facility
    • Design and Engineering
  • Projects
  • Careers
  • Latest News
  • Contact Us
  • Home
  • About
    • About LSWE
    • Mission / Vision / Values
  • Services
    • Civil & Offshore Construction
      • Civil & Structural
      • Offshore
    • Diving Systems
      • Saturation Diving Systems
        • Vessel Integrated Saturation Diving System
        • Portable Saturation Diving Systems
      • Air Diving Systems
      • Wet Bell Diving Systems
      • Hyperbaric Reception Facility
      • Life Support Package
      • Pressure Pot Facility
    • Design and Engineering
  • Projects
  • Careers
  • Latest News
  • Contact Us

Author Archives: admin_lswe

You are here:
  1. Home
  2. Portfolio Project
  3. (Page 2)
ZoomDetails

Machines

 
 

ProjectsBy admin_lsweJuly 18, 2023
ZoomDetails

DE120 – POB1 & 2

265 Tons
Supply, Fabricate and Install

ProjectsBy admin_lsweMay 4, 2018

Fabrication and Installation of Mandai Wellness Pods and Spiral Staircases

Latest NewsBy admin_lsweJanuary 1, 2026

On-going Fabrication and Installation of 5-Storey 230KV Substation at Aviation Park Road, Changi Planning Area (11,000 Tons)

Latest NewsBy admin_lsweDecember 24, 2025

On-going installations of Jurong West J105 JS6 & JS7 Main Station Roofs Entrances and Linkways (1,300 Tons)

Latest NewsBy admin_lsweDecember 24, 2025

Fabrication of Noise Barrier (530 Tons)

Latest NewsBy admin_lsweDecember 24, 2025

Fabrication and Installation of Pudo Roof Installation (1,150 Tons)

Latest NewsBy admin_lsweDecember 24, 2025

On-going Fabrication for DSTA Hangar (1,925 Tons)

Latest NewsBy admin_lsweDecember 24, 2025

Design Engineer

CareersBy admin_lsweMay 4, 2018

Design Engineer

CareersBy admin_lsweMay 4, 2018
123

© Copyright 2018. Leong Siew Weng Engineering (LSWE). All Rights Reserved. Website Design by Novage Communications

Go to Top